IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design - 000-606무료 덤프문제 풀어보기

A company is expecting a 50% increase in volume through one of their business processes. The current state model of the business process has already been created and verified through simulation. It is believed that the process will need to be updated in order to handle the increased throughput. A process analyst is performing "What-If" analysis upon a process model using simula-tion to solidify process knowledge. What approach should the process analyst first perform to aid in designing and verifying a future process design?

정답: D
Refer to the Exhibit.

The process analyst needs to simulate the process with the following business attributes: Total number of customer information business item received for the process = 100 Business items arrived at a rate of 1 per minute. How should the inputs business items be modeled in the simulation profile?

정답: C
A process analyst at a bank needs to quickly set up and run a simula-tion for the current loan process. This is a high-level process that lacks details. There are no details available about the values of input and output data. The bank manager has provided statistics of 70% approval rate and 30% rejection rate for this process. What kind of decision and simula-tion should be applied?

정답: C
Which of the following is an example of a Key Performance Indicator (KPI)?

정답: C
A truck company offers buyers the option to customize the cabin and body of a truck. The main order process handles cabin and body requests in parallel using different services. Which option illustrates the pattern to model these requirements?

정답: C
A business analyst needs to validate external process touch points using Business Designer. Which of the following will be useful in the validation?

정답: B,E
A process simula-tion completed with the message "simula-tion finished but not all tasks were completed successfully." Process case summary showed that all cases completed successfully. When simulating with half the number of tokens, the simula-tion completed successfully. What should be done to complete simula-tion on all the tokens?

정답: A
Which of the following is a critical success factor for business process modeling?

정답: A

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기 

English Deutsch 繁体中文 日本語