Oracle Utilities Customer Cloud Service 2021 Implementation Essentials - 1Z0-996-21무료 덤프문제 풀어보기
A usage subscription must exist before usage transactions can be calculated for a specific service point.
Where do you configure the usage recipient?
Where do you configure the usage recipient?
정답: A
Which describes derived values and their relationship with Final Measurements?
정답: C
Which two are "Are SP and Device Ready?" state algorithms for Enable Service? (Choose two.)
정답: B,C
Your implementation requires an installation of two types of devices:
Electric Smart Meter
Gas Manual Meter
Which two Device Type attributes are required to identify these device types? (Choose two.)
Electric Smart Meter
Gas Manual Meter
Which two Device Type attributes are required to identify these device types? (Choose two.)
정답: B,E
What can cause multiple bill lines for a rate component to be produced in a bill calculation header?
정답: B
Your client has the following requirements:
Many customers are installing their own solar electrical generation equipment. When these customers generate more electricity than required for their own use, the surplus can he exported back to the power grid.
In order to measure this generation, we have installed special scalar devices. These devices have separate registers to measure the energy generated (export) and the energy received (import) from the National Grid. Both reads will be stored in kWh, but the import is subtractive and export is consumptive.
What solution should you choose to configure the measuring component types for these specific requirements?
Many customers are installing their own solar electrical generation equipment. When these customers generate more electricity than required for their own use, the surplus can he exported back to the power grid.
In order to measure this generation, we have installed special scalar devices. These devices have separate registers to measure the energy generated (export) and the energy received (import) from the National Grid. Both reads will be stored in kWh, but the import is subtractive and export is consumptive.
What solution should you choose to configure the measuring component types for these specific requirements?
정답: B
Which two statements about usage subscription types are correct? (Choose two.)
정답: A,C
Critical validation rules verify the integrity of the initial measurement data (IMD). If an implementation needs toadd new critical validations, where would you configure them?
정답: D