Identify the element that does NOT belong to a Demand plan from Oracle Demand Planning.
정답: D
You are preparing to launch your ASCP plan, which Is constrained. Which three statements are correct In this context?
정답: A,B,D
Identify the statement that Is NOT correct.
정답: D
The planning engine provides the detailed bills of material (BOM) and Routing information associated with an Item from the Planner workbench.
You right-click and item in the Navigator and select BOM/Routing. The shortcut menu displays some options to further navigate to specific information.
Which two option are NOT displayed?
You right-click and item in the Navigator and select BOM/Routing. The shortcut menu displays some options to further navigate to specific information.
Which two option are NOT displayed?
정답: D,E
Identify the three correct statements about the setups required to enable pegging within an ASCP plan.
정답: B,D,E
Your client Is currently using a Constrained Plan In Production. The client states that the Inventory Turn Index remains below Its target and feels that an optimized plan would allow them to Improve their Inventory turns.
You Instruct the client that there are some additional setups required for the Optimized Plan to give meaningful results.
Identify the three setups that you would recommend as the minimum for an Optimized Plan to give credible results.
You Instruct the client that there are some additional setups required for the Optimized Plan to give meaningful results.
Identify the three setups that you would recommend as the minimum for an Optimized Plan to give credible results.
정답: A,B,C
After a plan completes successfully, the planning SuperUser wants to be Informed If there Is a quantity excess of 7500 for a specific group of items. What would be your recommendation?
정답: D
In your client's production environment, an Item may become one or more parent Items depending on factors such as process control, test results, and quality of raw materials. This Is the prime requirement of your client.
Which two Oracle Manufacturing products can be implemented along with Advanced Supply Chain Planning at your client site to meet this requirement?
Which two Oracle Manufacturing products can be implemented along with Advanced Supply Chain Planning at your client site to meet this requirement?
정답: A,C
Identify four exception messages that are most likely to appear In an unconstrained plan.
정답: A,B,C,E