VMware HCI Master Specialist - 5V0-21.21무료 덤프문제 풀어보기

A 30-minute power maintenance window has been approved on Sunday. Due to a delay, the maintenance took 20 minutes longer to finish.
During this time, the vSAN administrator noticed that one of the clusters nodes was affected by a power shortage, as it was connected to an affected power source. The default vSAN storage policy has been applied.
What will be the status of the vSAN objects on the affected host immediately after it is recovered?

정답: A
설명: (Fast2test 회원만 볼 수 있음)
An administrator is planning to deploy workloads on a six node vSAN cluster, and all nodes are distributed equally across three racks.
Which action is required to ensure that the workload VMs remain compliant with the default vSAN policy after a complete rack failure?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
A company has engaged a consultant to upgrade an existing vSAN cluster to vSAN 7.0 U1.
During the discovery phase, the consultant found the following information about the existing environment:
* The VMware vCenter Server has recently been upgraded from VMware vSphere 6.7 U3 to version 7.0 U1.
* The vSAN Cluster was recently expanded with identical hardware specification, but from a different hardware vendor.
* The hardware for each vSAN node is listed on the vSAN Compatibility Guide (VCG) for vSAN 7.
* The vSAN Cluster has the following configuration:
- vSAN version: 6.6.1
- Number of vSAN nodes: 10
- Encryption: enabled
- Deduplication and Compression: enabled
- vSAN Capacity Utilization: 60%
* Each vSAN node has the following configuration:
- VMware vSphere ESXi version: 6.5 Update 3
- CPU: 2 processors, 20 cores
- RAM: 768GB RAM.
- Disk: 2 Cache SSDs and 6 Capacity SSDs
- Network: 4 x 10GbE
Which three recommendations should the consultant make to ensure all data remains protected in the event of a vSAN failure? (Choose three.)

정답: C,E,F
설명: (Fast2test 회원만 볼 수 있음)
An administrator would like to upgrade ten identically configured 2-node vSAN clusters from vSAN 6.7 U3 to vSAN 7.0 U1. Currently, each 2-node vSAN cluster is using a dedicated vSAN witness host appliance. As a result of the upgrade, the administrator would like to leverage the vSAN shared witness feature to reduce the resources being consumed.
In preparation for the first vSAN cluster upgrade, the administrator has completed the following tasks:
1. Upgraded vCenter Server to vCenter Server 7.0 U1.
2. vSphere High Availability (HA) has been disabled on the vSAN Cluster.
3. Upgraded the vSAN witness host appliance to vSphere 7.0 U1.
4. Upgraded both vSAN data nodes to vSphere 7.0 U1.
The key requirement is to ensure that backwards compatibility to the existing version of vSAN is maintained during the upgrade process.
Which three additional steps should the administrator complete to ensure that subsequent clusters can share the same vSAN Witness? (Choose three.)

정답: B,E,F
설명: (Fast2test 회원만 볼 수 있음)
data centers, the customer relayed the following information:
* Highest possible mitigation during a host failure in terms of capacity.
* A constraint in this year's IT budget.
What should the architect recommend?

정답: C
설명: (Fast2test 회원만 볼 수 있음)
During a vSAN design workshop, a customer expressed a requirement to decommission an existing enterprise NAS device that provides iSCSI services for a clustered application.
Based on the current state analysis, the following information was noted:
* Current utilization is 500 LUNs.
* All clustered workloads are configured for Multiple Connections per Session.
* LUN sizes range between 10 TB to 30 TB.
What should the architect state regarding the requirements?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
An architect is tasked with designing a solution that includes the following requirements:
* The solution must support 5,000 virtual machines.
* The solution must include software defined storage.
* The deployment of the solution must be automated.
* The solution must provide storage-policy based disaster recovery for all workloads.
Which combination of three products will fulfill these requirements? (Choose three.)

정답: D,E,F

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기 

English Deutsch 繁体中文 日本語