Autodesk Certified Professional in BIM Management for Building Design - BIM_MGT_101무료 덤프문제 풀어보기

Refer to the exhibit.

A designer cannot see a 2x4 tile ceiling in the hallway area of their Reflected Ceiling Plan, but that same ceiling is visible in a 3D view. The 2x2 ceilings in the other rooms are visible in both views.
What are two possible reasons for this? (Select two.)

정답: C,D
설명: (Fast2test 회원만 볼 수 있음)
The BIM manager has finalized the BIM Execution Plan (BEP) for a multi-discipline educational facility project. Some consultants have already begun modelling, while others are onboarding late. A few external stakeholders are not listed in the original BEP distribution but will need access to coordinated models during design and preconstruction.
What two actions could be taken in order to manage distribution of updates? (Select two.)

정답: B,D
설명: (Fast2test 회원만 볼 수 있음)
The project manager would like to verify Autodesk Forma folder permissions assigned to team members but is not familiar with cloud-sharing platforms to access this information.
How can the BIM manager generate the required information?

정답: A
설명: (Fast2test 회원만 볼 수 있음)
During an initial coordination meeting, the team agreed that the contractor will be able to mark up the latest model and sheets in Autodesk Forma every week.
Which two actions should the BIM Manager take to ensure this is implemented correctly? (Select two.)

정답: B,C
설명: (Fast2test 회원만 볼 수 있음)
What setting should be defined in the Family Template for Mechanical Equipment families intended for use in projects in specific countries?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
An AEC company has received a design model from the Architect of Record to begin creating construction documentation. The BIM Execution Plan identifies a fast-track delivery schedule, and the project team includes new consultants with limited exposure to the client's preferred toolset and workflows. The BIM manager must determine how best to prepare the delivery team and assess the model's compatibility with internal systems.
As the BIM manager prepares for the Project Kickoff meeting, which two pieces of information are most critical to avoid issues related to digital compatibility? (Select two.)

정답: D,E
설명: (Fast2test 회원만 볼 수 있음)