SAP Certified Application Associate - Project System with SAP ERP 6.0 EHP4 - C-TPLM22-64무료 덤프문제 풀어보기

How can you distinguish between service activities and external activities while accessing the detailed information for service activities on the external tab page?
There are 2 correct answers to this question.
Response:

정답: B,D
Which of the following can be derived automatically when you carry out scheduling in projects with networks?
There are 2 correct answers to this question.
Response:

정답: B,C
In requirements grouping which indicator must be set for WBS elements that determines whether the requirements may be grouped into one WBS element and how?
Please choose the correct answer.
Response:

정답: B
Which of the following prerequisites need to be met in order to analyze the capacity requirements of an activity?
There are 3 correct answers to this question.
Response:

정답: A,B,D
How are cost-relevant items determined for stock materials while using planned costs in networks?
Please choose the correct answer.
Response:

정답: D
Which indicator do you use to define the characteristics of a WBS element and to specify tasks that are performed by the WBS element when the project is executed?
Please choose the correct answer.
Response:

정답: A
Items procured through which of the following methods are not assigned to a stock segment and do not pass through a warehouse?
Please choose the correct answer.
Response:

정답: A
Which type of billing is generally used in plant engineering and construction projects?
Please choose the correct answer.
Response:

정답: A
If the available user-definable fields do not satisfy your requirement, you have an option to develop additional fields for which of the following.
There are 2 correct answers to this question.
Response:

정답: C,D
What does 'E' determine in account assignment while using consumption posting indicator to determine the controlling object for the sales item?
Please choose the correct answer.
Response:

정답: C
Assume a scenario where in, during the planning phase you entered basic dates for WBS elements, for instance by creating graphical time bars in the project planning board and as a result in the execution phase you have an option to set the actual dates in the sameway in the project planning board.
What is the status that must be set before you can enter actual start and actual end dates?
There are 2 correct answers to this question.
Response:

정답: A,D
Which of the following aids in calculating actual overheads based on the costing sheet and overhead key entered?
There are 3 correct answers to this question.
Response:

정답: B,C,D
Consider a scenario where you have started by displaying the planned costs for the entire project and how these planned costs are distributed among the various value categories for
WBS element WBS 2.
You then want to analyze the planned costs of WBS element WBS 2 for value category 620 according to cost distribution to the various periods.
Which type of reporting allows you to achieve this?
Please choose the correct answer.
Response:

정답: D