SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - C-TS422-2022무료 덤프문제 풀어보기
What are the options if the Dispatched operation status is set for a production order operation?
Note: There are 2 correct answers to this question.
Note: There are 2 correct answers to this question.
정답: A,C
설명: (Fast2test 회원만 볼 수 있음)
in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run?
Note: there are 2 correct answers to this question.
which options do you have to exclude a material from the MRP run?
Note: there are 2 correct answers to this question.
정답: B,D
설명: (Fast2test 회원만 볼 수 있음)
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.
정답: C,D
설명: (Fast2test 회원만 볼 수 있음)
Which time elements can be reduced by a reduction strategy?
Note: There are 3 correct answers to this question.
Note: There are 3 correct answers to this question.
정답: B,D,E
설명: (Fast2test 회원만 볼 수 있음)
You can you use capacity availability checks for production orders, which settings have to be made for this?
Note: There are 2 Correct answers to this question?
Note: There are 2 Correct answers to this question?
정답: A,B
설명: (Fast2test 회원만 볼 수 있음)
You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?
정답: A
설명: (Fast2test 회원만 볼 수 있음)
You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?
정답: C
설명: (Fast2test 회원만 볼 수 있음)
Generic Parent Generic 1 pt
What is the purpose of collective orders?
What is the purpose of collective orders?
정답: D
설명: (Fast2test 회원만 볼 수 있음)
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA?
Note: There are 2 correct answers to this question.
Note: There are 2 correct answers to this question.
정답: B,D