SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 - C-TSCM42-67무료 덤프문제 풀어보기

You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly Which standard SAP material type do you use?

정답: D
Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?

정답: D
What sequence do you follow in master data maintenance to define the production of a material?

정답: D
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?

정답: C
What can you use to organize material staging for production orders? (Choose three)

정답: B,C,E
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)

정답: A,D
The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?

정답: D
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?

정답: D
The availability check during production order creation should use a different scope of check than during order release.
How can you fulfill this requirement?

정답: A

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기 

English Deutsch 繁体中文 日本語