IBM Power Systems with POWER8 Scale-out Technical Sales Skills V1 - C4040-251무료 덤프문제 풀어보기

A customer will be migrating from a POWER6 server to a POWER8 server
Which of the following statements is an advantage of SR-IOV compared to Integrated
Virtual

정답: C
A customer has a Power 750 with eight cores and 256GB of memory running Rod Hat
Linux They want to move to POWERS and use an existing EXP24S. The new workload requires sixteen cores and 1 5TB of memory.
Which server w# satisfy the requirements?

정답: C
A customer would like to replace a POWER6 server that is running an AIX in-house application at SMT2, with a new POWER8 system. The customer would like to know the relative performance of the servers.
Which resource provides the SMT2 performance of the two systems?

정답: B
A customer requires that each client partition have access to two different VLANs without
VLAN tagging.
There will be four client partitions and two VIO Servers.
Redundant Ethernet connections will be accomplished using the Shared Ethernet Adaptor
(SEA) end dual VIO Servers.
What is the minimum number of Ethernet ports that will be required in each VIO Server?

정답: A
An AIX customer wants to be sure they can update their SAN multipath drivers with a minimal amount of risk, while still being able to perform Live Partition Mobility operations.
Which disk connectivity technology supports these requirements?

정답: A
Compared with 720 quad-core , four -core S814 What added to the standard features to improve RAS capabilities ?

정답: C
A customer has two Power 570 servers that need to be replaced to accommodate company growth.
* The first server runs a transactional workload with high server usage during the day (8am-8pm)
* The second server runs analytic queries based on the transactional data during the night (10pm-6am).
A technical sizing analysis determined that each server would require (18) POWERS
3 .52GHz cores and 160GB RAM, considering the needed growth.
What would be the most cost-efficient way to satisfy the customer needs?

정답: A
A customer currently is running a POWER7 6-core 720 with 3 IBM i cores for production, and utilizing Power HA to a POWER6 2-core server as their backup machine.
The production machine also has unlimited users, IBM i Access users, SOL, and ILE
Compilers. They are only using the backup machine to do backups, but it is not a CBU; it has only one IBM i and one licensed Power HA core.
The customer wants the backup server to have the same capacity as the production server so it can be a true high availability server.
Which of the following is the correct course of action at the least cost?

정답: A
A customer wants to deploy SAP HANA on IBM Power Systems.
Which operating system is supported?

정답: B
A Power S822 is configured with the sight SFF disk storage backplane (EJOU) win an external SAS port.
Which expansion option is supported by the external SAS port connector of the EJOU?

정답: A
Customers want to have a mix of the S824 SSD and HDD, using the extended functions (18 disks) backplane (EJOP), and do not want to use the Easy Tier feature.
How to achieve ?

정답: B
A client is deploying an HPC workload on a cluster of S822LC systems with GPUs.
Which of the following is a supported operating system for the environment?

정답: A
A customer has a SAN team that wants to be able to easily map each LUN to a specific
WWPN on each client LPAR of a POWER8 server.
Which technology should be implemented to satisfy the requirement?

정답: A
설명: (Fast2test 회원만 볼 수 있음)
A customer would like to have a mix of SSD and HDD on their S824 using the Expanded
Function (18 disk) backplane (EJOP) and does not want to use Easy Tier functionality.
How can this be accomplished?

정답: A

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기 

English Deutsch 繁体中文 日本語