AACE International Certified Cost Professional (CCP) - CCP무료 덤프문제 풀어보기

A used concrete pumping truck can be purchased for $125,000. The operation costs are expected to be $65,000 the first year and increase 5% each year thereafter. As a result of the purchase, the company will see an increase in income of $100,000 the first year and 5% more each subsequent year. The company uses straight-line depreciation. The truck will have a useful life of five (5) years and no salvage value. Management would like to see a 10% return on any investment. The company's tax rate is 28%.
Taxes due at the end of year five (5) would be:

정답: C
설명: (Fast2test 회원만 볼 수 있음)
Two of the most important things to know when planning a speech or lecture are the ______________and______________ of your audience.

정답: D
설명: (Fast2test 회원만 볼 수 있음)
AACE International defines_____________as the primary activity that separates Value Methodology (VM) from other "improvement" practices and has the objective to develop the most beneficial areas for continuing study.

정답: A
설명: (Fast2test 회원만 볼 수 있음)
Which statement best describes the constructability review for a project?

정답: D
설명: (Fast2test 회원만 볼 수 있음)
After collecting the control information on a light rail project within an original budget of 200.000 work hours, the construction contractor is ready for their monthly progress meeting with the client.
A total of 100.000 work hours have boon scheduled to date. with 105.000 work hours earned, and 110.000 work hours paid. The stated progress by the contractor Is 60%.
What is the cost variance (CV)?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
After collecting the control information on a light rail project within an original budget of 200.0OO work hours, the construction contractor is ready for their monthly progress meeting with the client.
A total of 100.000 work hours have boon scheduled to date. with 105.000 work hours earned, and 110.000 work hours paid. The stated progress by the contractor is 60%.
After collecting the control information on a light rail project within an original budget of 200.000work hours, the construction contractor is ready for their monthly progress meeting with the client.
A total of 100.000 work hours have boon scheduled to date. with 105.000 work hours earned, and 110.000 work hours paid. The stated progress by the contractor Is 60%.
Is the percent complete stated by the contractor correct?

정답: D
설명: (Fast2test 회원만 볼 수 있음)
After collecting the control information on a light rail project within an original budget of 200.000work hours, the construction contractor is ready for their monthly progress meeting with the client.
A total of 100.000 work hours have boon scheduled to date. with 105.000 work hours earned, and 110.000 work hours paid. The stated progress by the contractor Is 60%.
What is the schedule variance (SV)?

정답: D
설명: (Fast2test 회원만 볼 수 있음)
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If $20,000 is invested at the end of each fiscal year for the next 10 years, how much would our total investment be worth assuming the interest is at 10%?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
A work breakdown structure (WBS) is developed because:

정답: C
설명: (Fast2test 회원만 볼 수 있음)
If a project is said to be on a "fast track program/' the fast track method is:

정답: C
설명: (Fast2test 회원만 볼 수 있음)
The following question requires your selection of CCC/CCE Scenario 28 (3.7.50.1.7) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If the owner in B has as his primary goal to get the project completed and on line as fast as possible, then he would most likely use the ______________type of contract.

정답: C
설명: (Fast2test 회원만 볼 수 있음)
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The recognition of loss of value of a natural resource used in the production process is referred to as:

정답: A
설명: (Fast2test 회원만 볼 수 있음)
____________ is defined as covering work whose component activities are less defined and whose interrelationships are conditional.

정답: D
설명: (Fast2test 회원만 볼 수 있음)
Meetings require:

정답: A
설명: (Fast2test 회원만 볼 수 있음)