Construction Specifications Institute Construction Documents Technologist - CDT무료 덤프문제 풀어보기

Which of the following is NOT included in Divisions 02-49 of a project manual?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
Which of the following is a scaled view?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
Which type of warranty is used to provide a remedy to the owner for material defects or failures after completion and acceptance of construction?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
What is the term used to describe the time it takes to procure an item on site?

정답: C
설명: (Fast2test 회원만 볼 수 있음)
Which of the following is a component of project design team coordination during the construction documents phase?

정답: A
설명: (Fast2test 회원만 볼 수 있음)
An architect/engineer (A/E) is reviewing a claim from a contractor asking for more money and time on the project. The A/E plans to reject this claim based on documentation supplied by the contractor indicating what reason?

정답: A
설명: (Fast2test 회원만 볼 수 있음)
Which of the following statements best describes stakeholder and participant interest in a project?

정답: A
설명: (Fast2test 회원만 볼 수 있음)
The emphasis shifts from overall relationships and functions to more technical issues during which design phase?

정답: C
설명: (Fast2test 회원만 볼 수 있음)
The owner's budget may not be adequate to pay for the entire project. What method is used to allow flexibility in the event that the budget is exceeded by the bids?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
What requirement is set by authority, custom, or general consensus that is also an established accepted criterion?

정답: B
설명: (Fast2test 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기 

English Deutsch 繁体中文 日本語