ISQI ISTQB Certified Tester Advanced Level - Test Analyst (Syllabus 2012) - CTAL-TA_Syll2012무료 덤프문제 풀어보기

Apart from state transition testing, which other specification-based technique would you additionally choose to test the interfaces between components of "Route Calculation" and thus typically find different types of defects?

Identify the MOST likely technique from the following list.
[K4] 3 credits

정답: A
As part of defining an approach the usability, acceptance criteria need to be defined. Which of the following acceptance criteria would be appropriate for operability?
[K4] 3 credits

정답: D
Which of the following BEST explains the use of cause-effect graphing?
[K2] 1 credit

정답: D
A route calculation for a car navigation system has been developed using the following state table:

How many test cases are needed to achieve 0-switch coverage?
[K3] 2 credits

정답: C
You are applying pairwise testing and using orthogonal arrays. The following steps are all part of the process to be followed.
i) Determine the number of choices for each variable ii) Map the test problem onto the orthogonal array iii) Construct the test cases iv) Identify the variables v) Locate an appropriate orthogonal array
What is the correct order of the above mentioned process steps?
[K3] 2 credits

정답: C
A new banking system has 2 customers' types, 2 account types and will operate in two different countries?
How many test cases will be needed using the pair wise testing technique and the appropriate 2wise orthogonal array?
[K3] 3 credits

정답: B

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기 

English Deutsch 繁体中文 日本語