BCS ISTQB Certified Tester Foundation Level 2018 - CTFL18무료 덤프문제 풀어보기
Which of the following factors will MOST affect the testing effort required to test a software product?
정답: C
Which of the following BEST describes checklist-based testing?
정답: B
While reporting a defect, which of the following indicates the level of business importance assigned to the defect?
정답: B
Which of the following statements best characterises maintenance testing?
정답: A
Which of the following options BEST explain the pesticide paradox principle of testing?
정답: D
Which of the following statements about estimation of the test effort is WRONG?
정답: B
The four test levels used in ISTQB syllabus are:
1. Component (unit) testing
2. Integration testing
3. System testing
4. Acceptance testing
An organization wants to do away with integration testing but otherwise follow V-model.
Which of the following statements is correct?
1. Component (unit) testing
2. Integration testing
3. System testing
4. Acceptance testing
An organization wants to do away with integration testing but otherwise follow V-model.
Which of the following statements is correct?
정답: B
The four test levels defined for a common V-model testing approach are:
정답: A
Which of the following best describes the purpose of non-functional testing?
정답: B
Which statement describes the term "Statement Coverage"?
정답: C
Consider the following pseudo code
1. Begin
2. Read Gender
3. __Print "Dear"
4. If Gender = `female'
5. Print ("Ms")
6. Else
7. __Print ( "Mr")
8. Endif
9. End
How many test cases are needed to achieve 100 per cent decision coverage?
1. Begin
2. Read Gender
3. __Print "Dear"
4. If Gender = `female'
5. Print ("Ms")
6. Else
7. __Print ( "Mr")
8. Endif
9. End
How many test cases are needed to achieve 100 per cent decision coverage?
정답: A
Which of the following statements about test execution effort is true?
정답: D
Which of the following types of test tool are most likely to include traceability functions?
(i) Performance testing tool
(ii)Requirements management tool
(iii)Configuration management tool
(iv)Static analysis tool
(i) Performance testing tool
(ii)Requirements management tool
(iii)Configuration management tool
(iv)Static analysis tool
정답: B
설명: (Fast2test 회원만 볼 수 있음)
Which THREE activities would be valid steps during the development of the test strategy?
정답: A,C,G