SAP Certified Associate - Utilities with SAP ERP 6.0 (C_FSUTIL_60) - C_FSUTIL_60무료 덤프문제 풀어보기

You post a receivable for a contract account and receivable account 154001 is determined by the system.
What information could you change within the posting document that would enable the system to determine a different receivable account?

정답: D
A supplier has won new customers in a gas and electricity network.
How can the network subdivisions be modeled in IS-U?

정답: B
If the variant settings for transaction FPL9 only include non-statistical items, which items would you always see? (Choose three)

정답: A,C,D
A contract account has multiple services including deregulated electricity, gas, water, and waste
water.
The joint invoicing indicators are set on the contracts as follows:
-Electric Distribution = 1 (must),
-Electric Supply = 1 (must),
-Gas = 3 (must not),
-Water = 2 (can),
-Waste Water = 2 (can).
How many invoices are produced when you execute the invoice process if billing documents exist
for the Electric Distribution, Gas, and Water services?

정답: B
Which processes are supported within the standard SAP CRM Utilities Interaction Center agent business role? (Choose three)

정답: C,D,E
A utility company bills monthly, and considers any billing period that has a length of 25-35 days to be a normal monthly bill.
Where would you enter the interval so that when interval-based period control is selected, the billing engine considers the billing period length when determining the rate step calculation?

정답: D
A factor operand FACTOR1 is defined in the master data as follows:
-In installation facts, FACTOR1 has a value of 10 from November 1 2012 to December 31 9999.
-In rate facts, FACTOR1 has a value of 1 from July 1 2012 to December 31 9999.
-In rate category facts, FACTOR1 has a value of 5 from June 1 2012 to December 31 9999.
Using this master data, you bill the contract from July 1 2012 to July 31 2012.
What value will the billing engine determine for the operand FACTOR1?

정답: D
What is the main purpose of the reconciliation key?

정답: A

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기 

English Deutsch 繁体中文 日本語