Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)

정답: C,D,E
What functions can you use for sub operations? (Choose two)

정답: A,B
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?

정답: B
The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?

정답: D
Which activity can trigger an automatic availability check for the components of a production order?

정답: C
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case? (Choose two)

정답: A,B
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?

정답: C
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true?
(Choose two.)

정답: A,D
Which of the following scheduling types can only be used in capacity planning?

정답: A