To balance the capacity loss caused by the self-discharge of the battery during the use of the battery, it is necessary to charge the battery continuously and for a long time at constant voltage, which is called ().
정답: C
According to different layouts, the Fusion Module 2000 can realize battery entry or not.
정답: A
FusionModule1000 is an indoor intelligent micro-module data center solution.
정답: B
In the process of using the battery, in order to reduce the deterioration of the voltage imbalance between the batteries, it is necessary to increase the charging voltage of the battery pack, and to activate and charge the battery to extend the battery life, which is called ().
정답: D
The refrigerant air cylinder of Huawei air-cooled air conditioner does not need to be inverted on the electronic scale when charging the refrigerant.
정답: B
Which of the following air conditioning systems need to be equipped with a cooling tower or dry cooler?
정답: A
The NetCol5000C device is powered on and the reason why the fan does not turn may be ().
정답: D
The cabinet collector cannot be used for environmental data collection of IT cabinets.
정답: B
When the NetCol5000-A air conditioner was commissioned, Which statement about the possible cause of the "exhaust high pressure alarm" was wrong?
정답: D
When installing the UPS5000-E, there should be a certain distance between the back and the top to ensure ventilation and heat dissipation.
정답: A
When a fire occurs in the cabinet, what is used to activate the gas fire extinguishing device on site?
정답: D
The user can modify the ECC800's IP address from the () menu of the ECC800 Web interface.
정답: A
When the maintenance engineer arrives at the customer site, the working environment around the site should be recorded. The main collection items are (). (Multiple choice)
정답: A,B,C,D