IASSC Certified Lean Six Sigma Black Belt - ICBB무료 덤프문제 풀어보기
Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.
정답: C
A Full Factorial experiment using a 3 level 3 factor approach has been proposed to test the viability of an extrusion machine experiment. How many treatment combinations will this approach involve?
정답: C
Which one of the listed tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?
정답: C
For a Normal Distribution as samples size increases the Range in Mean and Standard Deviation decrease relative to the Mean and Standard Deviation of the population.
정답: A
The Lean toolbox includes all of the following items except __________.
정답: C
As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.
정답: A
During the ______________ phase of 5S is when we might implement a Red Tag program.
정답: A
Which of the items listed do not define what an X-Y Diagram is?
정답: E
The calculation of Column Total times Row Total divided by Grand Total yields expected values from what type of chart?
정답: A
Following process modifications, the Null Hypothesis states that no improvement to the process has occurred. If we discover the Null Hypothesis Test was rejected when it was false that would be a(n) ________________________.
정답: B
If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?
정답: C