When tracking refrigerant leakage for EAc3: Enhanced Refrigerant Management Performance, what information should be recorded during the recharge process?

정답: B
설명: (Fast2test 회원만 볼 수 있음)
A project team can demonstrate a percentage improvement in GHG emissions to achieve points under EAc1:
Greenhouse Gas Emissions Reduction Performance, Option 3. Total Greenhouse Gas Emissions from Building Energy Use by

정답: A
설명: (Fast2test 회원만 볼 수 있음)
The LEED rating system determines the weighting of individual credits within the credit categories by

정답: C
Which of the following is a requirement for a building to comply with EAp2: Energy Monitoring and Reporting?

정답: C
설명: (Fast2test 회원만 볼 수 있음)
According to EQc6: Resilient Spaces, the intent for developing an event management mode is to

정답: A
설명: (Fast2test 회원만 볼 수 있음)
Which of the following review stages is not included in LEED O+M rating system?

정답: D
설명: (Fast2test 회원만 볼 수 있음)
The scenario will be displayed with each question for reference. Please use the scenario information when answering.
Central Office Park is a 153,000 ft2 (14 214 m2) existing commercial office building situated in a suburban business district.
During a recent operational audit, the management team confirmed that the building has 300 regular occupants. The building sees a daily average of 40 visitors and is located in an area with a Walk Score of 66.
To better understand occupant behavior, the team conducted a transportation survey during the current reporting period. The results revealed that 26% of the regular occupants commute using active and shared modes of transportation.
The property includes a surface parking lot with 100 total parking spaces. Historically, the owner has bundled parking passes with tenant leases at no additional cost. To pursue LTc2: Transportation Demand Management, they are planning to unbundle parking from all leases. Research confirms the local market rate for similar parking is $150 per month. To mitigate possible tenant dissatisfaction during the transition, the owner has proposed a policy of charging a discounted flat fee of $100 per month for each parking space.
Just outside the property line, a contiguous bicycle network is located 1,000 ft. (305 m) from the building ' s main entrance.
As part of a capital improvement plan to address decarbonization, the owner has allocated budget to install electric vehicle supply equipment (EVSE). They have selected Level 2, ENERGY STAR-certified chargers.
The owner has specified that the units be installed as standalone devices without a network connection to the utility provider or internet.
During a stakeholder meeting to discuss the new parking strategy, a tenant representative expresses concern about rising costs. To address this, the property manager presents the owner ' s discounted fee proposal as a compromise. Does this compromise meet the requirements for LTc2: Transportation Demand Management, Option 1. Unbundled Parking?

정답: C
설명: (Fast2test 회원만 볼 수 있음)
During the integrative process of planning a sustainable project, which of the following is a key consideration to ensure effective collaboration among team members and stakeholders?

정답: A
설명: (Fast2test 회원만 볼 수 있음)