Microsoft Dynamics AX 2012 Lean Manufacturing - MB6-884무료 덤프문제 풀어보기
You need to determine whether the production flow is running too quickly. Which takt time should you compare with the actual takt time?
정답: B
설명: (Fast2test 회원만 볼 수 있음)
You are setting up the following three process activities in a production flow in Microsoft Dynamics AX 2012:
The first process activity picks the bill of materials (BOM) components and outputs a semi-finished product.
The second process activity picks the semi-finished product from the first activity and outputs a different semi-finished product than the first activity.
The third process activity picks the semi-finished product from the second activity and outputs a finished product.
How should you configure the first process activity?
The first process activity picks the bill of materials (BOM) components and outputs a semi-finished product.
The second process activity picks the semi-finished product from the first activity and outputs a different semi-finished product than the first activity.
The third process activity picks the semi-finished product from the second activity and outputs a finished product.
How should you configure the first process activity?
정답: B
설명: (Fast2test 회원만 볼 수 있음)
An inventory controlled transfer Kanban is posted in Microsoft Dynamics AX 2012.
To which ledger accounts does the transaction post?
To which ledger accounts does the transaction post?
정답: A
설명: (Fast2test 회원만 볼 수 있음)
Which of the following are Kanban types in Microsoft Dynamics AX 2012? (Each correct answer presents a complete solution. Choose two.)
정답: B,D
설명: (Fast2test 회원만 볼 수 있음)
You are creating a Kanban rule in Microsoft Dynamics AX 2012.
You need to ensure that the system generates a Kanban for replenishment if the item
inventory reaches the minimum level. Which replenishment strategy you should choose in the Kanban rule?
You need to ensure that the system generates a Kanban for replenishment if the item
inventory reaches the minimum level. Which replenishment strategy you should choose in the Kanban rule?
정답: A
설명: (Fast2test 회원만 볼 수 있음)
Which setting is optional for a production flow?
정답: A
설명: (Fast2test 회원만 볼 수 있음)
Which cost category of a work cell is considered in costing for Lean manufacturing in Microsoft Dynamics AX 2012?
정답: D
설명: (Fast2test 회원만 볼 수 있음)
Which of the following actions can be performed when processing with the supply schedule in Microsoft Dynamics AX 2012? (Each correct answer presents a complete solution. Choose three.)
정답: A,C,E