Scrum Professional Scrum Developer - PSD무료 덤프문제 풀어보기
Select three criteria for the definition of done
정답: A,C,D
설명: (Fast2test 회원만 볼 수 있음)
What is a unit test?
정답: D
설명: (Fast2test 회원만 볼 수 있음)
What are the two primary ways a Scrum Master helps a Scrum Team work at its highest level of productivity?
(choose the best two answers)
(choose the best two answers)
정답: B,D
설명: (Fast2test 회원만 볼 수 있음)
When more teams are working on the same product. How should they go about their definition of done?
정답: A
설명: (Fast2test 회원만 볼 수 있음)
Which best describes the practice of expressing requirements as acceptance tests?
정답: C
설명: (Fast2test 회원만 볼 수 있음)
What are two ways developers can ensure a good architecture? (two answers)
정답: C,E
설명: (Fast2test 회원만 볼 수 있음)
The three pillars of empirical process control are:
정답: B,D,F
설명: (Fast2test 회원만 볼 수 있음)
What is the practice of branching code in a version control system?
정답: B
설명: (Fast2test 회원만 볼 수 있음)
What is the definition of done good for? Choose all that apply.
정답: C,D
설명: (Fast2test 회원만 볼 수 있음)
Which of the following best describes an increment of working software?
정답: B
설명: (Fast2test 회원만 볼 수 있음)
True or False: Product documentation may be required as part of a working Increment.
정답: A
설명: (Fast2test 회원만 볼 수 있음)
Several scrum teams share the scrum master. Developers of multiple teams approach the scrum master, because they need fulltime commitment from the same technical specialist for the next sprint. What should the scrum master consider for the response to this problem? Choose the two best answers.
정답: A,C
설명: (Fast2test 회원만 볼 수 있음)