Oracle Manufacturing Cloud 2020 Implementation Essentials - 1z0-1075-20무료 덤프문제 풀어보기
Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud.
정답: A,C,D,F
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?
정답: B
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.
Identify the two reasons that can cause the Reservations tab not to be displayed.
정답: D,E
In your customer's manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies form the Warehouse subinventory through automatically created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?
정답: B
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
정답: A
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
정답: D
An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order.
Identify two options that can cause this situation.
Identify two options that can cause this situation.
정답: B,C