A dedicated LPAR has two dedicated Fibre Channel HBAs assigned to it.
In order to reduce the amount of hardware, the LPAR will be migrated to a currently
running VIO server.
The administrator collects some server performance from the VIO server and notices that the I/O peaks at 5.5Gbits and runs at an average of 4Gbits per second.
The VIO Server runs two dual port 8Gbit FCS cards, so the load is not affected by other LPARS on the VIO Server.
Which of the following is the most cost-efficient configuration for the VIO client?
In order to reduce the amount of hardware, the LPAR will be migrated to a currently
running VIO server.
The administrator collects some server performance from the VIO server and notices that the I/O peaks at 5.5Gbits and runs at an average of 4Gbits per second.
The VIO Server runs two dual port 8Gbit FCS cards, so the load is not affected by other LPARS on the VIO Server.
Which of the following is the most cost-efficient configuration for the VIO client?
정답: B
Consider the following extract from the command Ismap -all -npiv -fmt:
vfchost0:U9119.FHA.44ABCDE-V2-C642:47:: :NOT_LOGGED_IN;fcs2:U5803.001.9112345-P2-C7-T1:0:4::
vfchost1:U9119.FHA44ABCDE-V2C643:48:lpar02AIX:LOGGED_IN:fcs2:U5803.001.9112345-P2-C7-T1:5:a:fcsO:U9119.FHA
44ABCDE-V48-C8-T1
From this information which of the following statements is true?
vfchost0:U9119.FHA.44ABCDE-V2-C642:47:: :NOT_LOGGED_IN;fcs2:U5803.001.9112345-P2-C7-T1:0:4::
vfchost1:U9119.FHA44ABCDE-V2C643:48:lpar02AIX:LOGGED_IN:fcs2:U5803.001.9112345-P2-C7-T1:5:a:fcsO:U9119.FHA
44ABCDE-V48-C8-T1
From this information which of the following statements is true?
정답: B
An administrator must create several production and development LPARs on a new Power 770 server. Processor requirements for the development LPARs change frequently.
Which configuration will isolate the production LPARs from changes in processing requirements for the development LPARs?
Which configuration will isolate the production LPARs from changes in processing requirements for the development LPARs?
정답: D
A second virtual disk has been added to a SuSE Linux LPAR on the existing vhost0 adapter. What must be done for this disk to be recognized on the Linux LPAR?
정답: C
An administrator is designing a new system. Redundancy is critical, and cost must be kept as low as possible.
The system planned is a Power 770 with 2 enclosures, each with a 10Gb IVE. It will support 6 dedicated production LPARs, 8 development LPARs, and 2 VIO Servers.
Production and development networks must be separate from each other.
Which of the following network solutions supports the requirements above?
The system planned is a Power 770 with 2 enclosures, each with a 10Gb IVE. It will support 6 dedicated production LPARs, 8 development LPARs, and 2 VIO Servers.
Production and development networks must be separate from each other.
Which of the following network solutions supports the requirements above?
정답: A
After installing a new VIO server partition an administrator noticed that the time zone is incorrectly set to CST6DST. The administrator would like the time zone set to Europe/London. Which command will achieve this?
정답: C
A new VIO Server environment has been created to support several VIO Clients. Disks have been assigned to both VIO Servers. Which of the following will ensure that disks can be mapped from both VIO Servers?
정답: D
Requirements for a disaster recovery site are being collected. When considering restoring a VIO Server mksysb to disaster recovery hardware, what is required to ensure automatic virtual device recreation?
정답: A
An LPAR was created on a POWER6 system with default processor/memory settings. It was migrated from the POWER6 system to a POWER7 system. Over time, that LPAR has been shutdown and restarted.
An administrator now needs to migrate the LPAR back to the POWER6 system, but it fails to validate.
There have been no changes in the LPAR profile, network, or in the SAN configuration.
Which action will enable the operation to complete successfully?
An administrator now needs to migrate the LPAR back to the POWER6 system, but it fails to validate.
There have been no changes in the LPAR profile, network, or in the SAN configuration.
Which action will enable the operation to complete successfully?
정답: D
An administrator uses DLPAR on an active LPAR to add an additional VLAN ID into an existing virtual adapter used by the SEA. The operation fails with error HSC01221 stating that the Modification of Virtual I/O resources failed. The server being modified is a POWER6 595 running firmware version EH350_071. The VIO Server is at version 2.2.0.10 FP24Based on this information, what is the most likely cause for this error?
정답: D
A Power Systems server has two HMCs connected to its Flexible Service Processor (FSP). It is decided to upgrade one of them to a later hardware version. The 7042-CR3 is disconnected and the new 7042-CR6 is connected in its place. The new HMC successfully discovers the managed server but some operations including DLPAR are failing.
Which action will allow the managed server and HMC to establish new RMC configurations?
Which action will allow the managed server and HMC to establish new RMC configurations?
정답: D